banner

TM V11_10

 

Download section 10 (Upper Floors)

Version 11 of the LABC Warranty Technical Manual has been written by our technical experts to provide guidance on meeting the technical standards required at different stages of construction.

Section 10 of the manual covers Upper Floors.

 

Contents include:

  • Additional functional requirements for warranty approval (in addition to our general functional requirements)
  • Suspended timber
  • I-joists
  • Metal web
  • Floor boarding and plaster boarding for timber upper floors
  • Suspended beam and block
  • Concrete plank
  • General requirements for concrete upper floors
  • General requirements for cavity barriers and fire stopping