There are many things that are important to remember when building with piling foundations including getting the design and installation of the pile foundations right first time.

One thing you may not have considered is the documentation that needs to be submitted to ensure the foundations are approved by your surveyor.

We’ve summarised the 6 crucial documents required for piling construction in an easy to read infographic to help minimise any delays to your build.

The first 5 documents in the list need to be submitted to your surveyor before piling construction begins on site. The last two documents should be submitted as soon as they become available, preferably before any further work commences over the piles.

By Anna Symington